Work in progress - Image 2


This is after the area was cleared, leveled and the footings poured.
The room size will be 10 x 16, 8 x 10 for the observatory and 8 x 10 for the exercise half.
You will notice the city inspector checking out the footings.
We passed this first inspection and I gave the inspector a treat.

Previous Photo Home Next Photo